This email address is being protected from spambots. You need JavaScript enabled to view it.
wegen dringender Umbauarbeiten an unserer Stromversorgung
sind wir vom 13.02. bis 17.02.2026 telefonisch und per E-Mail nicht erreichbar.
Ab Mittwoch, 18.02.2026 sind wir wieder wie gewohnt für Sie da.
for ferric chloride for phosphate elimination
- with ladder and operation platform
- with filling cabinet attached to retention tank and double-walled filling pipe

- with dosing pumps and valves
- with integrated drip tray

- piping system with spring-loaded valve
- installation of media pipe in a protection tube

for a poly aluminium chloride blend
- with fully automatic siphon discharge pipe
- with container equipped with dosing station


for dosing of precipitation chemicals on a waste water treatment plant
- with dosing pumps and valves
- with integrated drip tray - with electric control unit

for ferric chloride for phosphate elimination
- with ladder and platform on tank
- with dosing unit (cabinet installation

30 m³ for Ferric cloride on a waste water treatment plant
